The works will be completed progressively from 2030.
SINGAPORE – Motorists can look forward to an extension of the existing Tuas Viaduct and improvements to a network of roads in Tuas South, which will be progressively ready from 2030.
At the same time, road improvement works will also take place along Tuas South Avenue 3, Tuas South Boulevard, Pioneer Road and Tuas South Avenue 5, added the authorities.
South Africa Latest News, South Africa Headlines
Similar News:You can also read news stories similar to this one that we have collected from other news sources.
Solar canopies being considered for Jurong, Tuas ports to generate renewable powerJTC is also studying the prospect of building solar canopies over roads, drains and other open spaces.
Read more »
Pfizer's new S$1 billion facility extension opens in Tuas, to create over 250 jobsSINGAPORE: Pfizer’s new S$1 billion (US$743 million) expanded facility in Tuas will create over 250 "highly skilled jobs" including roles in production, quality and engineering.
Read more »
Lorry stopped at Tuas Checkpoint found to have M'sian man hiding in cargo compartmentA Malaysian man was found trying to illegally depart Singapore via Tuas Checkpoint by hiding in the cargo compartment of a lorry on July 19.
Read more »
Sabana REIT secures TOP for 1 Tuas Ave 4 post enhancementpstrongEnhancement works took slightly over 15 months./strong/p pSabana Industrial Real Estate Investment Trust (a href="https://sbr.com.
Read more »
Singapore boosts container handling capacity as more ships callThe first of three additional berths at Tuas Port began operating on July 1 amid congestion.
Read more »
Singapore ports boost container handling capacity as more ships callThe first of three additional berths at Tuas Port began operating on July 1 amid congestion.
Read more »