Joburg City Power says its on track with recovery & dealing with outage backlogs

South Africa News News

Joburg City Power says its on track with recovery & dealing with outage backlogs
South Africa Latest News,South Africa Headlines
  • 📰 ewnupdates
  • ⏱ Reading Time:
  • 27 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 14%
  • Publisher: 53%

This comes after Eskom granted City Power a reprieve from power cuts as a result of residents experiencing extended power failures caused by the flooded sub-stations and damaged infrastructure.

JOHANNESBURG - Joburg City Power said that it had been able to attend to almost 3,000 outage calls from a backlog of the 5,000 they received after the recent heavy rains compromised the electricity supply.

City Power said that they were on the right track in terms of their recovery and dealing with the backlog of thousands of outage calls. City Power's Isaac Mangena: "We expect the real impact to be felt in the coming weeks and months, way after the flash floods have basically subsided. There is still a lot of work that still needs to be done to really address a lot of plants that are out of service, but also other projects to basically just stabilise the network and also replace the damaged infrastructure."

We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

ewnupdates /  🏆 30. in ZA

South Africa Latest News, South Africa Headlines

Similar News:You can also read news stories similar to this one that we have collected from other news sources.

City Power slashes power outage backlog calls after Eskom agrees to a load shedding reprieve | News24City Power slashes power outage backlog calls after Eskom agrees to a load shedding reprieve | News24City Power has managed to slash its power outage calls backlog to 2 000 from 5 000. Most of the calls are due to the heavy flooding across Johannesburg on 5 and 6 December. | IamAlexSweet
Read more »

City Power clears backlog of 3,000 calls during 72-hour load-shedding reprieveThe City of Johannesburg has cleared a backlog of 3,000 calls caused by the recent devastating storms during a 72-hour reprieve from load-shedding.
Read more »

Joburg to declare a state of disasterJoburg to declare a state of disasterRecent storms and flooding necessitate a declaration of a state of disaster, the city says.
Read more »

Petrol vs electric car costs from Joburg to Cape TownPetrol vs electric car costs from Joburg to Cape TownWhen comparing EVs and petrol cars on long road trips in South Africa, convenience might be more important than cost.
Read more »

SANDF deployed at power stationsThe army is being deployed at some power stations in South Africa as plant breakdowns, theft and vandalism contribute to unprecedented levels of load-shedding imposed by Eskom.
Read more »



Render Time: 2025-02-24 16:23:00