Eskom to implement stage 2 load shedding | IOL News

South Africa News News

Eskom to implement stage 2 load shedding | IOL News
South Africa Latest News,South Africa Headlines
  • 📰 IOL
  • ⏱ Reading Time:
  • 30 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 15%
  • Publisher: 51%

The load shedding was required to cater for 'further trips and to create capacity' to replenish water reserves for pumped storage schemes.

The load shedding was required to cater for "further trips and to create capacity" to replenish water reserves for pumped storage schemes. Sufficient water and diesel reserves were necessary to limit the level of load shedding in the coming week.

With "unplanned breakdowns" at 11,600MW as at 7pm on Saturday, Eskom continued to use water resources at pumped storage schemes to supplement capacity, but had not used any open cycle gas turbines to conserve emergency reserves. "We also ask customers to reduce demand as a concerted collective effort can help to avoid or lessen the level of load shedding. As we are experiencing rainy and cooler weather conditions in some parts of the country, we ask that you use efficient heating to keep warm and switch off your geysers over peak periods," Eskom said

We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

IOL /  🏆 46. in ZA

South Africa Latest News, South Africa Headlines

Similar News:You can also read news stories similar to this one that we have collected from other news sources.

Stage 2 load shedding until 11pm on Saturday, says Eskom | IOL NewsStage 2 load shedding until 11pm on Saturday, says Eskom | IOL NewsStage two load shedding is currently being implemented and will continue until 11pm on Saturday night, state-owned power utility Eskom said.
Read more »

Eskom implements stage 2 load-sheddingThe rotational power cuts will implemented from 4pm to 11pm, ‘due to a shortage of capacity’
Read more »

Eskom resumes stage 2 load-sheddingEskom will continue with stage 2 load-shedding until 11pm on Saturday, warning that the system remains “tight”
Read more »

Eskom confirms stage 4 load-shedding on FridayLoad-shedding has intensified due to equipment failure
Read more »



Render Time: 2025-02-25 06:31:09