Eskom CEO André de Ruyter says the theft of fuel at Kriel Power Station is disrupting their operations
","category_class":"child-of-news","time_ago":"31 mins ago","premium":false,"gallery":false,"excerpt":"The suspects are alleged to be behind other robberies in Gauteng","format":false,"media":"","oovvuu":"","oovvuu_div":"","external_link_url":""},{"id":3099254,"name":"WATCH: More racism allegations...
za\/news\/south-africa\/3099254\/stellenbosch-university-racism-allegations-16-may-2022\/","image_src":"https:\/\/media.citizen.co.za\/wp-content\/uploads\/2022\/05\/Stellenbosch-University-racism-300x200.jpg","image_src_hero":"https:\/\/media.citizen.co.za\/wp-content\/uploads\/2022\/05\/Stellenbosch-University-racism-788x550.jpg","image_src_narrow":"https:\/\/media.citizen.co.
South Africa Latest News, South Africa Headlines
Similar News:You can also read news stories similar to this one that we have collected from other news sources.
AMABHUNGANE: Fuel thieves siphon off millions from Mpumalanga Eskom power stationAs fuel prices soar, an ageing Eskom power station in Mpumalanga is the hub of a sophisticated theft operation siphoning off fuel worth millions of rands – with help from corrupt officials, trucking companies and police.
Read more »
amaBhungane | How fuel thieves siphon off millions from Eskom power station | Fin24A sophisticated crime syndicate – in cahoots with Eskom officials, police and trucking companies – is stealing millions of rands worth of fuel by exploiting a design flaw at the Kriel Power Station in Mpumalanga. | amaBhungane
Read more »
Eskom: More breakdowns at power stations will lead to escalation of power cutsThe utility has announced that South Africans will have to endure more rolling blackouts, with stage 3 power cuts expected from 5pm on Monday afternoon until 10pm in the evening.
Read more »
Eskom power cuts increase to Stage 3 from Monday — here is the scheduleEskom has announced that load-shedding will increase from Stage 2 to Stage 3.
Read more »
Eskom implements stage 2 power cuts until 10pm tonightMegawatt park said this latest bout is because of a further loss of generation capacity.
Read more »
Eskom told to expedite the fixing of Medupi and Kusile design defectsMabuza said the defects identified at Medupi and Kusile power stations 'must be corrected expeditiously'.
Read more »